Graded Before It's Pretty
We check where water sits on your lot after rain before we design the base. On an island with a high water table, that walk matters as much as which paver color you pick.
ISLAND GROUND. DRAINAGE FIRST.
Merritt Island sits between two lagoons with a water table that sits close to the surface. We plan the base and the drainage before we talk about which paver you want.
Paver installation in Merritt Island
Merritt Island is an island, and it behaves like one. The water table runs high most of the year, so a paver base that would work fine on higher ground elsewhere can hold water here instead of shedding it. Before we quote a driveway or patio, we walk the lot and look at where water actually goes after a hard rain — not where the plans say it should go. That walk changes the grade and the base design more often than people expect.
Because the water table sits close to the surface, we build the compacted base in lifts and grade it to move water away from the house and off the paved area, not just down into the ground underneath it. Bedding sand stays thin — about an inch — because thick sand is what turns a high-water-table lot into a soft spot down the road. Edge restraint gets fastened into the base itself, not into the sand, so the border holds even when the ground underneath stays damp longer than it does on the mainland.
What that looks like here
We check where water sits on your lot after rain before we design the base. On an island with a high water table, that walk matters as much as which paver color you pick.
The compacted base goes down in layers, not dumped and tamped once. On ground this close to the water table, that's the difference between a flat surface and one that dips in the wet season.
Edging is fastened into the compacted base, not pinned into the sand. On Merritt Island, where the ground stays damp longer than it does inland, that build detail keeps the border holding line year to year.
By the numbers
The Brevard County tax roll counts 15,967 single-family homes in Merritt Island. The typical one was built in 1978, and about 82% were built before 2000.
With most homes here past twenty-five years old, many cracked or worn driveways and patios are ready to be replaced with pavers.
Source: Florida Department of Revenue, Brevard County 2026 preliminary tax roll.
Free estimate
We'll measure, look at where the water goes, and leave you an itemized written estimate — anywhere in Merritt Island. No charge, no pressure.
Local questions
Not if we design for it. We look at where water sits on your lot before touching a shovel, then grade the base to move it away from the house. On Merritt Island, that pre-install walk-through is standard, not optional — the high water table doesn't leave room to skip it.
Pool decks here get more barefoot foot traffic than the rest of the yard, so we pay extra attention to surface texture right at the pool edge. The base underneath gets built the same way regardless — compacted in lifts, graded to shed water instead of holding onto it.
Depends on the scope of the job and whether we're changing how water moves across the lot. We'll walk you through exactly what your specific job needs and who's responsible for pulling it — more detail on permits and HOA review is at /permits-and-hoa/.
Keep looking around
Fastest answer
Most questions we can answer on the phone in two minutes, and if we need to see it we'll book the walkthrough while you're on the line.
(321) 586-9227Or text a photo of the space — that's often the fastest way to get a real answer. Prefer email? [email protected].
Free estimate
Tell us what you're picturing and we'll come measure it.
Five quick questions — then you're booked in and someone reaches out within 5 minutes. Prefer to talk? Call (321) 586-9227.